Logo
1 (630) 858-2600
Clinker Cooler Systems
Prior to cement entering clinker cooler systems, the cement needs to be cooled within a cooling tunnel after it has been dried in a rotary kiln. Chicago Blower’s forced draft fans and pressure blowers force the cool air through the tunnel to reduce the temperatures within the clinker system.
An error has occurred. This application may no longer respond until reloaded. Reload 🗙